Hessequa Abattoir(Pty)Ltd.
Construction Year: October 2014 – June 2015
Commissioning: July 2015
Feedstock:
Abattoir waste from sheep ~11 % DM
– Stomach
– Blood
– Slaughter waste
daily feeding: 9,5 to
Installation:
Mixing pit 40 cbm with Chopper Pump and cutting blades, Mixer, Shredder, Cooker and mechanical Screen.
400 cbm Double Chamber Digester ibert Digester system, in – and outlet pipes
400 cbm Storage Tank with Gas holder
Gas line with underground gas cooling system.
Technic Container with hot water manifold, CHP and electrical room
Energy:
CHP MAN 50 kW el. and 78 kW them.
Pre heating hot water system with 200l double coil water tanks.